Government and private tenders in India require a detailed Bill of Quantities (BOQ) — item description, unit, quantity, rate and amount. Pitara's BOQ calculator construction India replaces spreadsheet juggling: add line items, apply contingency and GST, and export CSV for tender annexures — all in your browser.
BOQ line item structure
- Item description (civil, electrical, plumbing work etc.)
- Unit: Nos, Sqm, Rmt, Cum as per tender schedule
- Quantity × Rate = Line amount
- Subtotal + Contingency % + GST % = Grand total
How to use the BOQ Calculator
- Open BOQ Calculator.
- Add rows with description, unit, qty and rate.
- Set contingency (often 3–5%) and GST slab.
- Export CSV for Excel or tender submission prep.
Also try GST Calculator, Fill & Sign PDF, and Tendering Tools hub.
Frequently Asked Questions
Can I export BOQ to Excel?
Yes — download CSV and open in Excel or Google Sheets.
Does BOQ include GST?
Set GST % — it is calculated on subtotal plus contingency.
Is this for eProcure tenders?
Use for estimates; follow tender notice format for final submission.
Is data uploaded?
All calculations run locally in your browser.
Try it free
Use our BOQ Calculator tool — runs in your browser, no upload required.
Open BOQ Calculator